Shop Categories

 [email protected]

The following NCSC Level-1 questions are part of our Nutanix NCSC Level-1 real exam questions full version. There are 78 in our NCSC Level-1 full version. All of our NCSC Level-1 real exam questions can guarantee you success in the first attempt. If you fail NCSC Level-1 exam with our Nutanix NCSC Level-1 real exam questions, you will get full payment fee refund. Want to practice and study full verion of NCSC Level-1 real exam questions? Go now!

 Get NCSC Level-1 Full Version

Nutanix NCSC Level-1 Exam Actual Questions

The questions for NCSC Level-1 were last updated on Feb 21,2025 .

Viewing page 1 out of 4 pages.

Viewing questions 1 out of 20 questions

Question#1

A consultant creates a four-node AHV cluster with two 1GbE (eth0, etc1) and two 10GbE (eth2, eth3) NICs per node. The 1GbE NICs will not be placed into service, but the customer wants the network to be preconfigured for their eventual use.
The consultant removes the 1GbE NIC from the default bond and creates a second bridge(br1), but is unable to add the 1GbE NIC using the below command:
manage_ovs Cbridge_name br1 Cinterfaces 1g Cbond_name br1-up update_uplinks
Which parameter is missing from this command?

A. --bond_duplex full
B. --require_link=false
C. --interfaces eth0
D. --bridge_duplex full

Question#2

A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.
Which configuration is causing this issue?

A. ESXi cluster admission control is disabled.
B. ESXi cluster DRS is enabled.
C. ESXi cluster HA is enabled.
D. ESXi cluster admission control is enabled.

Question#3

During a technical call with a customer, it is identified that this installation will be software only on Dell servers. The out-of-band management interfaces will not be given IP addresses until the consultant is onsite.
Which Foundation method should be used for this type of installation?

A. Bare metal using iDRAC MAC addresses.
B. Bare metal using LAN MAC addresses.
C. Bare metal using block serial numbers.
D. Bare metal using node serial numbers.

Question#4

During a six-node cluster deployment, one node fails to image successfully and Foundation is unable to automatically configure the cluster. The consultant decides to manually complete cluster formation with the successful nodes, then expand the cluster with the remaining unconfigured node.
Which command should be used to begin the process?

A. cluster status
B. cluster create
C. cluster start
D. cluster expand

Question#5

Where can a consultant find Nutanix Enablement Starter Packs (ESPs)?

A. In the Partner Portal
B. In the Nutanix .NEXT Community Forum
C. In the Support Portal
D. In the Services section of the Nutanix website.

Exam Code: NCSC Level-1Q & A: 78 Q&AsUpdated:  Feb 21,2025

 Get NCSC Level-1 Full Version